Conversion from traditional batch to continuous operated enameling plant
OEM had a classical batch operated wet enameling plant, which equipment was due for replacement.
Wished to explore latest process & equipment technology and considers the implementation of continuous operation and electrostatic powder application.
DTC provided overview of possible technologies, equipment specifications, concept plant lay-out & resulting CAPEX budgets, based on thorough analyses of coating requirements & product dimensions.
Assisted with identification of suitable equipment manufacturers & technical evaluation of obtained offers and arranged reference visits & application trials at a leading OEM.